Spotlight on our Projects

RAC 20 MW Power plant

Design,  Engineering,   Installation , Testing and Commissioning of 11 X 2000 KW, 13.8 KV Diesel Generator Power Plant consists of MV Switchgear, Diesel Fuel Tanks, BMS System, Fire Protection system (Foam System, Novec1230,Fire alarm) and ventilation system (Sound Attenuators, louvers ,ventilation fans)designed to achieve 85dBA@1m.

AMX Control System

Design, Supply, Installation Programming and Commissioning of AMX Control system to control AV and Polling system in Boardroom and Auditorium room.

40MW Prime Power Plant

Design,  Engineering,   Installation , Testing and Commissioning of 16 X 3000 KW, 13.8 KV Diesel Generator Power Plant consists of MV Switchgear, 2M Capacity Bulk Fuel Storage tank, Remote Horizontal Radiator Cooling System,  Acoustic Ventilation system design to achieve 85dBA @ 1m .

32 MW Hail Power Plant Project

Design, Engineering, Supply, Installation, Testing and Commissioning  of 16 x C2000D6, 13.8KV,60Hz.Turnkey Solution – Civil, Electromechanical Works DMC300, MV Switchgear, NER,Transformers

Conveyor Systems - Biscuit Factory Automation Work

The installed systems prioritize reliability, minimizing downtime and contributing to a continuous production flow. Additionally, our eco-friendly design aligns with Pladis Global’s commitment to sustainability.

Aseptic Plant HVAC Works- Alkharj

Design , Supply , Installation , Testing & Commissioning of  HVAC System ( FAHU,FCU Glycol and Ammonia System for the Aseptic Plant with coordination With Krones

Installation , O&M - KBR - RSAF

Installation of 3MW,5MW,3MW -3 Prime Power plant and Annual Maintenance of Complete plant

KAFD Fuel Oil System

Design , Supply & Installation of Complete Fuel System for the standby Generators of King Abdullah Financial District parcel 1.10,1.09,1.11,1.14,1.15,4.09 & 4.12.

Design, Supply & Installation of Complete Generator Set and accessories including Chilled Water cooling system and Ventilation system in Parcel 4.09

We Provide the Best Service in Industry​

We put ourself in our customer’s place

  • A collaborative robot palletizer, the RC14 handles payloads of up to 12kg at twelve boxes per minute. Without a fence or cage surrounding it, the small footprint gives flexibility in its location.
  • Following ISO standard TS 15066 for robots, the RC14 is designed to work alongside personnel; if an operator comes into contact with the robot arm, it will automatically stop to reduce the risk of injury.
  • Robot Config software allows the operator to quickly design a new pallet pattern or load an existing one, including interlayers and adjustments for label location.
  • The drag-and-drop tool eliminates design errors and takes less than 10 minutes to create the first configuration. It eliminates the need for programming or training
  • A collaborative robot palletizer,the RC12 handles payloads of up to 10kg at twelve boxes per minute. Without a fence or cage surrounding it, the small footprint gives flexibility in its location.
  • Following ISO standard TS 15066 for robots, the RC12 is designed to work alongside personnel; if an operator comes into contact with the robot arm, it will automatically stop to reduce the risk of injury.
  • Robot Config software allows the operator to quickly design a new pallet pattern or load an existing one, including interlayers and adjustments for label location. 
  • The drag-and-drop tool eliminates design errors and takes less than 10 minutes to create the first configuration. It eliminates the need for programming or training.
  • A collaborative robot palletizer, the RC10 handles payloads of up to 8kg at eight boxes per minute. Without a fence or cage surrounding it, the small footprint gives flexibility in its location.
  • Following ISO standard TS 15066 for robots, the RC10 is designed to work alongside personnel; if an operator comes into contact with the robot arm, it will automatically stop to reduce the risk of injury.
  • Robot Config software allows the operator to quickly design a new pallet pattern or load an existing one, including interlayers and adjustments for label location.
  • The drag-and-drop tool eliminates design errors and takes less than 10 minutes to create the first configuration. It eliminates the need for programming or training.